Moorabool Wind Farm.

The Moorabool Wind Farm project is located approximately 4km south of Ballan, approximately 67km from Melbourne, 27km from Ballarat and 47km from Geelong. It will extend 14km north to south between Ballan and Mount Wallace to the west of the C141 (Geelong ballan Road).

The Minister for Planning approved the construction and operation of 107 wind turbines. If 2.75 MW turbines are installed on all 107 sites, this would result in 294.25MW of renewable electricity being generated. This is enough renewable energy to power the equivalent of 183,000 average Victorian homes annually.

The project is divided into two sections, the Bungeeltap Section towards the North of the project site and the Ballark Section to the south.

location_plan-002

Construction is expected to commence in mid 2017 and the wind farm is expected to commence operation in the latter half of 2018.